NextEra Energy Majestic Wind

Company Summary

Description

» Located in Carson County, Texas » A 79.5-megawatt wind generation plant » 53 1.5-megawatt GE turbines that are capable of generating enough electricity to power more than 19,800 homes » Each wind turbine is 262 feet tall from the ground to the center of the blade hub » Began commercial operation in Jan. 2009 » Acquired in Dec. 2009 by NextEra Energy Resources Majestic II » Located in Carson and Potter counties, Texas » A 79.6-megawatt wind generation plant » 20 GE 1.5-megawatt turbines and 31 GE 1.6-megawatt turbines » Built, owned and operated by a subsidiary of NextEra Energy Resources » Began Commercial operation in 2012