Front Range Pipeline provides reliable takeaway capacity for natural gas liquids (NGL) production in
the growing DJ Basin to the Gulf Coast markets.
• Business Segment: NGL Logistics
• Location: From Weld County, Colo. to Skellytown, Texas
• Scope: A 435-mile NGL pipeline, with connections to the Mid-America Pipeline system and
the Texas Express Pipeline
• Type of project: Organic (Dropdown of DCP Midstream’s one-third interest in Nov. 2013)
• Capacity: Initial capacity of 150,000 barrels per day (Bbls/d); expandable to 230,000 Bbls/d
• Ownership: Joint venture, owned one-third each by DCP Midstream Partners, Anadarko
Petroleum Corp. and Enterprise Products Partners (operator)
• Projected in-service: February 2014